Agrium Fertilizer Plant in Redwater
Brief description:
-
Agrium Fertilizer Plant in Redwater
-
Read more
-
Capture Method: Pre-combustionCapture Technology:Capital cost: Financial support:finsup--> Volume:0.6 Mtpa tonnes
- 53.709701 -113.213768
Facts:
Main developer:
Country:
Canada
Project type:
Capture
Scale:
Large
Status:
Under construction
Year of operation
2014
Industry:
Chemical products
Capture method:
Pre-combustion
New or retrofit:
Retrofit
Transport of CO2 by:
Pipeline
Type of storage:
EOR
Volume:
0.6 Mtpa tonnes/CO2
Enhance Energy Inc. has entered into long-term CO2 supply agreements with Agrium Inc to supply CO2 from the Agrium Fertilizer Plant in Redwater for the Alberta Carbon Trunk line (ACTL), to be used in several enhanced oil recovery projects in the Clive field.
More information about the pipeline project: http://www.zeroco2.no/projects/alberta-carbon-trunk-line
Agrium Fertilizer simplified process flow diagram CO2 production (source: http://www.enhanceenergy.com/presentations/Enhance_ACTL_Houston_EOR_presentation.pdf - slide 18)
Contact info
Main developer:
Main contact person:
- Susan Cole, (, PRESIDENT)
Homepage:

