This interactive map shows CCS projects (planned or operational) around the globe.

It is designed as an interactive resource for the emerging world of CCS stakeholders, and others interested in CCS.

You can also choose to get the projects, the countries or the developers (mainly industry and power companies) listed.


Last modified projects

Ketzin

Country: Germany
Project type: Storage
Scale: Small
Read more..

Masdar Initiative CCS projects

Project type: Capture Storage
Scale: Small
Read more..

Don Valley Power Project

Country: United Kingdom
Project type: Capture Storage
Scale: Large
Read more..

Sleipner West

Country: Norway
Project type: Capture Storage
Scale: Large
Read more..

Mongstad

Country: Norway
Project type: Capture Storage
Scale: Large
Read more..

Air Products Port Arthur

Country: USA
Project type: Capture Storage
Scale: Large
Read more..

Hydrogen Power Abu Dhabi (HPAD)

Project type: Capture Storage
Scale: Large
Read more..


View projects as list        View countries       View developers

Red Marker Naturkraft Kårstø

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
5,275 mrd NOK (2006)
Financial support:
finsup
--> Volume:
1 000 000 tonnes
59.2804327 5.5238188
Yellow Marker European CO2 Technology Centre Mongstad

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine Ammonia
Capital cost:
6,0 mrd NOK
Financial support:
finsup
--> Volume:
100 000 tonnes
60.8044095 5.0364612
Green Marker In Salah

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
USD 1,7 B
Financial support:
finsup
--> Volume:
1 200 000 tonnes
27.194189 2.473933
Red Marker Bluewaters Power Station

Read more

Capture Method:
Not decided
Capture Technology:
Capital cost:
A$800 million
Financial support:
finsup
--> Volume:
tonnes
-33.3321417722 116.228785515
Yellow Marker Callide Oxyfuel Project

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
A$206 Million
Financial support:
finsup
--> Volume:
60,000 tonnes
-24.401296 150.511308
Red Marker Coolimba Oxy-fuel Project

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
A$1 billion
Financial support:
finsup
--> Volume:
2.9 million tonnes per year tonnes
-29.817799 115.267594
Yellow Marker Gorgon CO2 Injection Project

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
A$1 billion
Financial support:
finsup
--> Volume:
3.6 million tonnes tonnes
-20.7804342 115.4022706
Green Marker Hazelwood Carbon Capture Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
A$369 million
Financial support:
finsup
--> Volume:
10,000 tonnes per year tonnes
-38.1863867741 146.42578125
Green Marker Munmorah PCC

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
A$5 million
Financial support:
finsup
--> Volume:
3000 tonnes
-34.584542 150.850276
Red Marker ZeroGen

Read more

Capture Method:
Pre-combustion
Capture Technology:
Amine
Capital cost:
A$4.3 billion
Financial support:
finsup
--> Volume:
2 million tonnes
-23.378941 150.512323
Green Marker CO2CRC Otway Storage Project

Read more

Capture Method:
Capture Technology:
Capital cost:
A$ 40 Million
Financial support:
finsup
--> Volume:
65 000 tonnes
-38.513250986 142.789993286
Green Marker Loy Yang PCC Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine Ammonia Membrane
Capital cost:
A$5 million
Financial support:
finsup
--> Volume:
1000 tonnes per year tonnes
-38.21114 146.474087
Yellow Marker HRL Loy Yang IDGCC

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
A$750 million
Financial support:
finsup
--> Volume:
tonnes
-38.255862 146.592067
Green Marker Tarong PCC Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
A$5 million
Financial support:
finsup
--> Volume:
1500 tonnes
-26.5406 151.836117
Green Marker CO2CRC/HRL Mulgrave Capture Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Amine Ammonia Membrane
Capital cost:
A$4.1 million
Financial support:
finsup
--> Volume:
tonnes
-37.930492 145.156538
Green Marker CO2CRC H3 Capture Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine Ammonia Membrane
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
-38.298154 146.353163
Green Marker Weyburn-Midale CO2 Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
$1.1 billion. Pipeline: $US 100 M
Financial support:
finsup
--> Volume:
1 000 000 tonnes
49.668285 -103.858244
Red Marker Pembina Enhanced Oil Recovery Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
$200-250 million
Financial support:
finsup
--> Volume:
tonnes
49.176891 -98.492816
Red Marker Fort Nelson gas plant CCS project - Spectra Energy

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 000 000 tonnes
58.804594 -122.697436
Red Marker Pioneer Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
Financial support:
finsup
--> Volume:
1 000 000 tonnes
53.561798 -114.468338
Red Marker Belle Plaine Integrated Polygeneration CCS Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$5 billion
Financial support:
finsup
--> Volume:
1 000 000 tonnes
53.277931 -110.003474
Red Marker Husky CO2 – EOR Projects in Lloydminster area

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.277931 -110.003474
Red Marker Genesee Demonstration Plant - Alberta Saline Aquifer Project (ASAP)

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 000 000 tonnes
53.354209 -114.330892
Green Marker Petrobras Miranga CO2 injection

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine Membrane
Capital cost:
Financial support:
finsup
--> Volume:
400 tonnes per day tonnes
-12.366667 -38.25
Green Marker Schwarze Pumpe

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
€ 120 million
Financial support:
finsup
--> Volume:
tonnes
51.5689856 14.377526
Red Marker Jänschwalde CCS

Read more

Capture Method:
Post-combustion Oxyfuel
Capture Technology:
Ammonia
Capital cost:
€1 billion
Financial support:
finsup
--> Volume:
1.7 million tonnes
51.8593826 14.4964374
Red Marker RWE IGCC Plant in Hürth

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
€ 2 billion
Financial support:
finsup
--> Volume:
2 600 000 tonnes
50.870961 6.868111
Green Marker RWE, BASF and Linde’s scrubbing plant in Niederaussem

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
€ 9 million
Financial support:
finsup
--> Volume:
2 000 tonnes
50.984682 6.668384
Yellow Marker E.ONs Post Combustion – Wilhelmshaven

Read more

Capture Method:
Post-combustion
Capture Technology:
Other
Capital cost:
€ 10 million
Financial support:
finsup
--> Volume:
tonnes
53.517063 8.119749
Yellow Marker E.ONs Post Combustion – Heyden

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
51.156661 6.448475
Green Marker E.ON’s Post Combustion – Hanau

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
€ 10 million
Financial support:
finsup
--> Volume:
tonnes
50.135407 8.915129
Red Marker RWE npower – Blyth post-combustion project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
55.1270807 -1.5088196
Red Marker Longannet

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
2 000 000 tonnes
56.9209967584 -3.43872070312
Red Marker North East CCS Cluster

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
7.2 million GBP
Financial support:
finsup
--> Volume:
7.5 million tonnes
55.2138212 -1.5423426
Yellow Marker Ferrybridge post-combustion project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
£21m
Financial support:
finsup
--> Volume:
100 tonnes per day tonnes
53.7120486 -1.2734088
Red Marker C.GEN Killingholme IGCC project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.6316106066 -0.1318359375
Red Marker Kingsnorth post-combustion project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
51.1187065 0.8584122
Red Marker RWE npower – Tilbury post-combustion project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
1 billion GBP
Financial support:
finsup
--> Volume:
tonnes
51.4622947 0.3550761
Red Marker RWE npower – Aberthaw post-combustion Project

Read more

Capture Method:
Capture Technology:
Capital cost:
£8.4 million
Financial support:
finsup
--> Volume:
tonnes
51.4622947 0.3550761
Red Marker Don Valley Power Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
5 million tonnes
53.5778688 -1.0008979
Green Marker Lacq

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
€60 million
Financial support:
finsup
--> Volume:
120,000 tonnes
43.4122975 -0.6160333
Green Marker Claye-Souilly CCS programme

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
200,000 tonnes
48.9449893 2.6841677
Red Marker Porto Tolle

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 000 000 - 1 500 000 tonnes
46.2634426718 11.2280273438
Green Marker The CRUST project

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
20 000 tonnes
53.5846796214 5.56933611631
Red Marker The Enecogen project

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
52.3738007 4.8909347
Red Marker The Nuon Magnum Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.5121109 6.5903365
Red Marker The SEQ ‘Zero Emission Power Plant’ Project

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
€ 60 million
Financial support:
finsup
--> Volume:
250 000 tonnes
53.1074553 6.0968015
Red Marker Japan-China EOR project

Read more

Capture Method:
Capture Technology:
Capital cost:
20-30 billion yen
Financial support:
finsup
--> Volume:
1 000 000 - 1 500 000 tonnes
47.8333333 127.6666667
Red Marker White Tiger CCS project

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
4 600 000 tonnes
14.058324 108.277199
Red Marker Bintulu CCS project

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
3 000 000 tonnes
3.19057 113.0901109
Red Marker GreenGen

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$ billion
Financial support:
finsup
--> Volume:
2 million tonnes
39.120876 117.21503
Green Marker PCC Demo Project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
A$4 million
Financial support:
finsup
--> Volume:
3 000 tonnes
36.684978 117.088411
Red Marker Hydrogen Power Abu Dhabi (HPAD)

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$2 billion
Financial support:
finsup
--> Volume:
1.7 million tonnes
26.1455762076 54.052734375
Green Marker Snøhvit

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
700 000 tonnes
70.6888889 23.6069444
Green Marker Sleipner West

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
USD 100 million
Financial support:
finsup
--> Volume:
1 000 000 tonnes
58.2100807116 2.31738299131
Red Marker Mongstad

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine Ammonia
Capital cost:
Investment decision is ready in 2016
Financial support:
finsup
--> Volume:
1 000 000 - 2 500 000 tonnes
60.8134278 5.029225
Red Marker Sargas Husnes

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
US $700 million
Financial support:
finsup
--> Volume:
2 600 000 tonnes
59.8586481 5.7403275
Red Marker Wallula Energy

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$2.2 billion
Financial support:
finsup
--> Volume:
tonnes
46.1079122 -118.9200008
Yellow Marker Riley Ridge

Read more

Capture Method:
Capture Technology:
Capital cost:
$130.6 Million
Financial support:
finsup
--> Volume:
tonnes
43.0759678 -107.2902839
Green Marker Kimberlina

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
$90,594,099
Financial support:
finsup
--> Volume:
250 000 tonnes
35.5580378 -119.3285728
Red Marker Hydrogen Energy California (HECA)

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$2.3 billion
Financial support:
finsup
--> Volume:
2 000 000 tonnes
35.2816303 -119.4440061
Red Marker BP Carson (DF2)

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$2 billion
Financial support:
finsup
--> Volume:
4 000 000 - 5 000 000 tonnes
33.7946699119 -118.20483394
Red Marker Entrada

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 100 000 tonnes
35.6815584 -106.009199
Red Marker Antelope Valley, Basin Electric

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
$500 million
Financial support:
finsup
--> Volume:
1 000 000 tonnes
47.9875032 -100.1323568
Red Marker Williston Basin

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
47.2502848 -101.7507236
Red Marker Tenaska Trailblazer

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
$3,5-billion
Financial support:
finsup
--> Volume:
tonnes
32.4709519 -100.4059384
Red Marker Zeng Worsham-Steed

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
$90-$120 million
Financial support:
finsup
--> Volume:
tonnes
34.0827612 -99.032108
Red Marker AEP Northeastern

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
$300 million
Financial support:
finsup
--> Volume:
tonnes
36.4470387 -95.708315
Red Marker NRG Energy Parish plant

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
1.5Mtpa tonnes
29.7632836 -95.3632715
Red Marker Cranfield

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 500 000 tonnes
31.5604442 -91.403171
Red Marker FutureGen 2.0

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
$1.3 billion
Financial support:
finsup
--> Volume:
1.3 million tonnes
39.4830897 -88.3728255
Red Marker TAME

Read more

Capture Method:
Capture Technology:
Capital cost:
$92,846,271
Financial support:
finsup
--> Volume:
280 000 tonnes
40.1028264 -84.6330115
Red Marker Mountaineer

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
670 Million USD
Financial support:
finsup
--> Volume:
1 500 000 tonnes
38.4707937112 -83.9465332031
Red Marker Appalacian Power

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
US$2.23 billion
Financial support:
finsup
--> Volume:
tonnes
38.986468 -81.9734718
Blue Marker Utsiraformation

Read more

Capture Method:
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
approximately 1 million tonnes CO2 tonnes
58.1707024835 2.63671875
Blue Marker Johansen

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
60.8449105736 3.515625
Red Marker E.ON Karlshamn

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
€11 million
Financial support:
finsup
--> Volume:
tonnes
56.1704026 14.8630072
Red Marker Alberta Carbon Trunk Line (Enhance Energy)

Read more

Capture Method:
Other
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 800 000 tonnes
52.4752532 -113.4458432
Red Marker Quest project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Amine
Capital cost:
$1.35 billion
Financial support:
finsup
--> Volume:
1 200 000 tonnes
54.3933522238 -115.828857422
Red Marker Belchatow

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
Financial support:
finsup
--> Volume:
1,8 Mt tonnes
51.3687535 19.3564248
Red Marker C.GEN Rotterdam

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
51.9133910148 4.45589447161
Yellow Marker Compostilla

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
€200 million
Financial support:
finsup
--> Volume:
1 million tonnes
42.5640751 -6.5950738
Red Marker Meri Pori

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 250 000 tonnes
61.5594321 21.6121716
Blue Marker Altmark

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
52.7166667 11.4
Red Marker Rotterdam Climate Initiative

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
51.9226899 4.4707867
Red Marker Brindisi

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
€20 million
Financial support:
finsup
--> Volume:
8000 tonnes
40.6361753 17.9389909
Green Marker Fusina

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
45.419133 12.2567677
Red Marker Nordjylland Power Station

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
2 billion DK
Financial support:
finsup
--> Volume:
1.8 million tonnes tonnes
57.0472247 9.9201043
Yellow Marker Southern Company CCS Demonstration

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
100,000-150,000 tonnes
30.3321452 -88.1488892
Blue Marker Vedsted

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
57.1452815 9.541538
Red Marker Esbjerg

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
16 M EU
Financial support:
finsup
--> Volume:
tonnes
55.4672695 8.4490779
Green Marker Renfrew test facility

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
55.8775302 -4.3894343
Red Marker RWE-Essent Eemshaven

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.4453779 6.8354141
Yellow Marker Air Products Port Arthur

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
approx $384 million
Financial support:
finsup
--> Volume:
1 million tonnes
29.369571 -98.422604
Red Marker Mt. Simon Sandstone

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
40.6331249 -89.3985283
Red Marker Leucadia Energy, LLC, Lake Charles

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
4.5 million tonnes
30.2265949 -93.2173758
Yellow Marker Cemex (Houston)

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
29.7628844 -95.3830615
Red Marker Agrium Fertilizer Plant in Redwater

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
0.6 Mtpa tonnes
53.709701 -113.213768
Red Marker North West Upgrading

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 200 000 tonnes
53.712759 -113.213196
Red Marker Swan Hills ISCG/Sagitawah Power Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
$1.5 billion estimated overall cost for the ISCG/carbon capture and storage system and power generation
Financial support:
finsup
--> Volume:
1.4 Mtpa tonnes
54.71667 -115.402749
Yellow Marker Texas Clean Energy Project (TCEP)

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
2.7 million tonnes tonnes
31.8456816 -102.3676431
Green Marker The Great Plains Synfuels Plant

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
$2.1-billion for total plant (not CO2-capture)
Financial support:
finsup
--> Volume:
3 000 000 tonnes
47.2633403 -101.7779462
Yellow Marker University of Texas- CCS storage project Houston

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
29.7628844 -95.3830615
Blue Marker Redwater Leduc Reef complex

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.9489558 -113.1284896
Blue Marker Wabamun region

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.557789 -114.468426
Green Marker Mobile Test Unit (MTU)

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
56.2082078 -3.1495175
Green Marker Buggenum

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
40 mill Euros
Financial support:
finsup
--> Volume:
tonnes
51.2319852 5.9808398
Yellow Marker Illinois ICCS Project (ADM)

Read more

Capture Method:
Other
Capture Technology:
Other
Capital cost:
approx $208 million
Financial support:
finsup
--> Volume:
1 million tonnes
39.8403147 -88.9548001
Yellow Marker NRG Energy's CCS demonstration project at WA Parish

Read more

Capture Method:
Capture Technology:
Amine
Capital cost:
334 mill US dollar
Financial support:
finsup
--> Volume:
400,000 tons of carbon dioxide per year. tonnes
30.267153 -97.7430608
Red Marker Zama CO2 EOR Pilot Project

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
57.788404 -117.855936
Red Marker Aquistore - CCRL Refinery in Regina

Read more

Capture Method:
Capture Technology:
Capital cost:
C$ 100 mill
Financial support:
finsup
--> Volume:
550 tonn/day tonnes
50.45 -104.61
Red Marker Heartland Area Redwater storage Project (HARP)

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.9489558 -113.1284896
Red Marker Peterhead

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
57.505919 -1.78319
Green Marker Husky Mervin CO2-EOR Project

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.333 -108.873
Red Marker Boundary Dam integrated CCS project

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
$1.24 billion (canadian $)
Financial support:
finsup
--> Volume:
1 million tonnes
50.2823194501 -104.447021484
Green Marker Iwanohara Demonstration Test Site

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
40 tonn per day, july 2003-Jan 2005 tonnes
35.173808318 138.69140625
Green Marker CO2 Recovery Plant to Urea production in Abu Dhabi

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
100 000 tonnes
24.1 52.733333
Green Marker QPC Quimica Methanol Plant

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
90 t/d tonnes
-23.8556980098 -44.8791503906
Green Marker Jagdishpur - India. Urea plant

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
150 t/d CO2 tonnes
26.45 81.616667
Green Marker Aonla, Urea plant, India. Indian Farmers Fertiliser Co-Operative Ltd.

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
450 t/day tonnes
28.276608 79.168361
Green Marker Phulpur - Urea plant - India. Indian Farmers Fertiliser Co-Operative Ltd.

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
450 t/day tonnes
26.077973 82.869447
Green Marker Sumitomo Chemicals Plant - Chiba - Japan

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
150-165 t/d tonnes
1.3288267 103.6372753
Green Marker Fukuoka - Japan

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
283 T/D (Max. 330 T/D) tonnes
33.5903547 130.4017155
Green Marker Luzhou Natural Gas Chemicals

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
160 t/d tonnes
28.87176 105.442141
Green Marker Bellingham

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
320-350 t/d tonnes
42.0867641 -71.4745055
Yellow Marker Hunterston

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
55.722808 -4.87822
Red Marker Wandoan Power IGCC

Read more

Capture Method:
Pre-combustion
Capture Technology:
Amine
Capital cost:
no information available
Financial support:
finsup
--> Volume:
2.5 million tonnes per annum tonnes
-25.0059726562 148.634033203
Red Marker Browse LNG

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
-14.4346802153 120.673828125
Red Marker Collie South West Hub

Read more

Capture Method:
Post-combustion Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
3.3 million tonnes
-33.359907 116.15258
Red Marker Victorian CarbonNet

Read more

Capture Method:
Post-combustion Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
4-10 million tonnes
-38.500415 142.760581
Red Marker ANR TACoMA

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
48.8566667 2.3509871
Red Marker European COCATE project

Read more

Capture Method:
Post-combustion Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
49.4925909 0.1065027
Red Marker DECARBit project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
54.3677585241 5.09765625
Red Marker France Nord Project

Read more

Capture Method:
Not decided
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
48.8357974624 2.900390625
Red Marker Le Havre C2A2

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
49.4925909 0.1065027
Green Marker Ketzin

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
52.477986 12.842078
Red Marker Lula CO2 reinjection

Read more

Capture Method:
Other
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
-26.7456103822 -43.06640625
Red Marker NORCEM Cement plant in Brevik, Norway

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
In total 13.5 mill. NOK/1.7 mil EUR
Financial support:
finsup
--> Volume:
10 000 ton tonnes
59.0554872 9.6980052
Red Marker The Longyearbyen CO2 lab

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
78.21859 15.64875
Red Marker Yulin Integrated CTL Complex

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
5-10 million tonnes tonnes
37.1603165467 112.1484375
Red Marker Korea-CCS2

Read more

Capture Method:
Pre-combustion Oxyfuel
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1.2 tonnes
36.4743067551 127.946777344
Red Marker Shenhua Group CTL

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 million tonnes
39.608266 109.781327
Red Marker Dongguan Taiyangzhou IGCC

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 million tonnes
23.132191 113.266531
Red Marker Lianyungang IGCC

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
I million tonnes
34.596544 119.221282
Red Marker CO2 Global - Project Viking

Read more

Capture Method:
Oxyfuel
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1,2 mill tonnes tonnes
32.8423345 -104.4032962
Red Marker Rotterdam Afvang en Opslag Demo (ROAD) in Maasvlakte

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1,1 Mt tonnes
51.9525 4.0463889
Red Marker Boise White Paper Mill

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
720 000 tonnes tonnes
46.0854121 -118.9052776
Red Marker South Heart IGCC

Read more

Capture Method:
Capture Technology:
Other
Capital cost:
2,2 bill dollar
Financial support:
finsup
--> Volume:
2.1 million tonnes tonnes
47.5514926 -101.0020119
Red Marker Masdar Initiative CCS projects

Read more

Capture Method:
Post-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
4.3 million tonnes
24.4291667 54.6183333
Red Marker Air Liquide Green Hydrogen Project

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
51.9058333 4.2486111
Red Marker ArcelorMittal & ULCOS Florange

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
0,5 Mt tonnes
49.3260406 6.1316857
Red Marker Turceni

Read more

Capture Method:
Post-combustion
Capture Technology:
Ammonia
Capital cost:
Financial support:
finsup
--> Volume:
1,5 Mt tonnes
44.6666667 23.3833333
Red Marker PurGen One

Read more

Capture Method:
Other
Capture Technology:
Other
Capital cost:
5,2 bill dollar
Financial support:
finsup
--> Volume:
tonnes
40.6220478 -74.2445902
Red Marker National Carbon Capture Center (NCCC)

Read more

Capture Method:
Post-combustion Pre-combustion
Capture Technology:
Amine
Capital cost:
Financial support:
finsup
--> Volume:
200 000 tonnes
33.234281 -86.4835916
Red Marker North East CCS transport network

Read more

Capture Method:
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
53.703525 -0.871465
Red Marker Coffeyville Gasification Plant

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
650 000 - 770 000 tonnes
37.0373005 -95.6163665
Yellow Marker Lost Cabin

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1 million tonnes
43.268015 -107.6903574
Red Marker Salt Creek EOR

Read more

Capture Method:
Capture Technology:
Capital cost:
200 mill US dollar
Financial support:
finsup
--> Volume:
tonnes
43.5463375 -106.3154639
Blue Marker CEPAC Carbometano Project

Read more

Capture Method:
Other
Capture Technology:
Other
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
-29.9 -51.516667
Green Marker CO2 Capture Project FCC pilot

Read more

Capture Method:
Oxyfuel
Capture Technology:
Other
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
-18.7167124 -39.859389
Blue Marker SWP Gordon Creek

Read more

Capture Method:
Natural Gas Separation
Capture Technology:
Capital cost:
$29 million
Financial support:
finsup
--> Volume:
1 million tonnes tonnes
39.6163305 -110.9021106
Red Marker Taichung CCS

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
24.2332076 120.9417368
Yellow Marker Kemper County IGCC

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
US$2.4 billion
Financial support:
finsup
--> Volume:
tonnes
32.8018452 -88.7108964
Red Marker Sinopec Shengli PCC

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1,000,000 tonnes
29.598993 121.043758
Red Marker Alstom Datang

Read more

Capture Method:
Not decided
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
2 million tonnes
46.5890690831 125.101318359
Yellow Marker Shute Creek

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
7 million tonnes
42.2621975 -110.1954371
Green Marker Enid Fertiliser Plant

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
0.68 million per annum tonnes
36.3505270054 -97.8662109375
Green Marker Val Verde natural gas plants

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
1.3 million tonnes
29.8687682 -101.1617356
Green Marker Century Plant

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
5 million tonnes
30.8253214 -102.6216211
Red Marker Maritsa TPP

Read more

Capture Method:
Post-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
2.5 million tonnes
42.4239169 25.6249022
Red Marker Kentucky NewGas

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
5 million tonnes
37.1772501 -87.1422895
Red Marker Medicine Bow CTL

Read more

Capture Method:
Pre-combustion
Capture Technology:
Other
Capital cost:
Financial support:
finsup
--> Volume:
3.6 million tonnes
41.6032207 -106.912251
Green Marker Puertollano IGCC Pilot

Read more

Capture Method:
Pre-combustion
Capture Technology:
Capital cost:
Financial support:
finsup
--> Volume:
tonnes
38.6860347 -4.1121461
Red Marker Delimara CCS

Read more

Capture Method:
Not decided
Capture Technology:
Capital cost:
€800
Financial support:
finsup
--> Volume:
tonnes
35.8220706 14.5587891


= Operative, = Under construction, = other, = Storage sites

How the map works

Click on a pin to find out more details about each site. In the window click on the title to go to the project. Zoom in and out of the map using the + and - buttons on the top left. Hold the left mouse button to drag the map. Please use the tools to zoom into your relevant location. There are frequently multiple CCS sites located near each other and zooming into a location would reveal any hidden sites.

Disclaimer:
This information is believed to be as up-to-date and accurate as it can be at the time of its inclusion in the database, based on information available. However, the world of CCS is constantly evolving and ZERO cannot guarantee complete accuracy. If you do spot any errors or have ideas for improving this resource, please email us at camilla@zero.no